Today new 3/4" plywood underlayment was installed for the new prefinished tongue and groove oak flooring. Tomorrow the installation of the kitchen cabinets begins.

The outside duct enclosure was formed up and
fast setting concrete was poured

The contractor is removing the existing kitchen
flooring, plywood underlayment and wood sleepers


Making sure that the subfloor is level


New 3/4" plywood underlayment glued and screw
fastened to the existing subfloor.

The new plywood floor had to be cut for the existing
conduit feed running on the subfloor to the cooktop wall

Contractor priming the walls


Walls ready for cabinetry and or paint