The electricians got to work very early in the morning to pull new wiring to the existing electrical panel, install and hookup some of the under cabinet puck lighting, wire and install the existing oven and running new wire to the existing track lights and ceiling fan in the living room.
The vent pipe enclosure and wood paneling items were completed.
The new dishwasher will be delivered later this week and the electricians will provide electrical outlets for the existing cooktop and recessed refrigerator. The pendant light over the eating area will be wired up to the electrical switch and the suspended light fixture in the middle of the kitchen will be installed and wired as well.
The new prefinished tongue and groove wood kitchen floor will be installed also this week.




New wiring is installed to the existing
fan and track lites in the living room along the
beam top to new wall switches as well


New electrical conduit in basement



Pulling new wiring to the existing electrical panel


The bottom wall cabinet panels having cutouts holes installed
for the puck lights



The puck lites under the kitchen and dining room
cabinets being installed

The puck lites over the sink area are completed


The existing oven is installed into its cabinet and hooked up

Preparing the lite track for the suspended pendant light


The pendant light over the eating area of the counter
is suspended from the lite track under the wood purlin


The existing vent stack is now enclosed and the wood ceiling
paneling has been completed