The next phase in the coming week will be pulling the electrical wiring from the existing electrical panel for the installation and hookup of some of the appliances and new kitchen and existing living room light fixtures. New light switches, dimmers and electrical outlets and a new speaker telephone will also be installed. The dishwasher and disposal unit will be hooked up later in the project after the countertops and sink are installed.


The refinisher by hand is trying out different stain mixings to match as close
as possible the color before applying to the entire unfinished area

Mixed stain color is brush applied over previous days
polyurethane coat

Next the urethane final coat is mixed with a stain
to match the old floor

Brush applying the stained colored polyurethane

The final coat has been applied

Floor starting to dry out
No comments:
Post a Comment